❌

Normal view

Received — 9 September 2026 ⏭ MIT Technology Review

Batteries just broke another record in the US

9 September 2026 at 10:00

Battery installations hit a new record in the US in the second quarter of 2026. In total, 20.2 gigawatt-hours of new capacity came online, according to a new report. That’s enough to supply the daily electricity needs of about 700,000 homes.

The surge is putting the country on a trajectory to see 71 gigawatt-hours of batteries installed in 2026, a 20% increase over last year. This growth is being driven by a combination of cheaper batteries and an urgent need for more energy storage capacity as renewables such as solar and onshore wind power are added to the grid. 

Massive, utility-scale systems are leading the way; they’re responsible for most of the record-setting quarter. Seven new gigascale battery installations (those with a capacity of over one gigawatt-hour) came online during the three-month stretch, according to the report, published by Benchmark Mineral Intelligence and the Solar Energy Industries Association.

“It really came down to a handful of big projects,” says Shan Tomouk, energy storage and energy lead for Benchmark Mineral Intelligence.

But there was also growth in the category of so-called behind-the-meter batteries, which include both residential and industrial battery storage systems. These projects, generally smaller than utility-scale installations, are typically owned and operated by homeowners or businesses rather than utilities or power providers. 

In the behind-the-meter category, data centers led the way, making up about three-quarters of new batteries in the commercial sector. But residential batteries saw a sharp slowdown. These systems are often installed in homes to store power from solar panels or serve as a backup source in case of a blackout. Home installations are projected to drop by 16% in 2026 compared with last year, according to the report.

That drop happened largely because a tax credit that helped subsidize home battery systems ended in 2025, Tomouk says. Home installations should recover by the end of the decade, he adds. And tax credits for nonresidential batteries have largely survived.

Overall, batteries are a bright spot in energy right now. “This is one of the strong sectors in the US,” says Isshu Kikuma, an energy storage analyst at BloombergNEF, an energy consultancy.

As the battery market continues to grow, one major trend to keep an eye on is a move toward US-made technology. Today, nearly all the systems coming online use cells made in China, though some are put together into complete energy storage systems in the US.

Tariffs were already pushing the US energy storage industry toward domestic production. And beginning this year, energy storage tax credits required projects to limit their reliance on batteries imported from China. There’s a lot of manufacturing capacity set to come online in the US, though these factories probably won’t be able to meet demand until at least 2030 or so, Tomouk says, so prices could tick up.

Received — 2 August 2026 ⏭ MIT Technology Review

How an overlooked geothermal plant got a second chance

29 July 2026 at 18:58

In June 2024, a small company called Zanskar purchased a geothermal power plant in New Mexico that was failing fast. The water coming from the underground reservoir was getting colder by the day, making the plant uneconomical to run.

Now, two years later, that plant is running at full capacity again, thanks to a new well. With the help of advanced modeling and modern drilling technology, the company was able to identify a better potential well site, drill down thousands of feet, and revive the entire operation.

As the world looks for more sources of emissions-free electricity that are available 24-7, Lightning Dock shows there’s still hidden potential deep beneath our feet. 

Conventional geothermal power plants rely on having the right underground conditions. Water flows through fractured hot rocks to harvest heat and then through a power plant to generate electricity. If the water isn’t hot enough or not enough flows, the power plant can’t work efficiently.

Lightning Dock came online in 2013, and the site historically had two production wells that were used to feed the power plant. It’s common to see temperatures drop at a well site over time, typically at a rate of 1 to 2 °F per year. In the period before Zanskar took over the site, Lightning Dock saw temperatures drop by 50 °F over five years, a rate of 10 °F per year. When the company purchased the facility, the water going into the power plant was just 250 °F, while the plant was designed to operate at temperatures of at least 310 °F. 

When Zanskar mapped the underground conditions at Lightning Dock using advanced modeling techniques, they discovered that the wells were only hitting the very top of the reservoir there. Those production wells were quite shallow (at just 2,500 feet deep) and not in the best location, says Joel Edwards, Zanskar’s cofounder and CTO.

The company’s modeling predicted that if the company were to drill another, deeper well in a new spot, the plant would be able to run efficiently. The team drilled a new well that reaches a depth of 8,000 feet and started operation in May 2025.

After a full year, the well is still flowing at more than 4,000 gallons per minute. The plant has “completely turned around,” Edwards says. “It looks really exciting.”

The data so far shows that the plant should be successful for years to come. “Ultimately you need to run these things for long time frames to get confidence in their performance over long time frames,” Edwards says.

The progress at Lightning Dock could be good news for other geothermal sites too. The conventional wisdom in geothermal energy is that the deeper you go, the hotter it gets. But there’s usually a trade-off: With those depths come rocks that are packed tighter together. So drilling deeper could mean the hot water can’t flow as effectively, a problem for anyone trying to use it to generate electricity in a power plant.

What the team found, however, was that the flow actually increased in the area where they drilled the new well. “That fundamentally changes how you think about not just Lightning Dock but all hydrothermal assets in America and what the potential can be for all of them,” says Ben Brenner, director of federal affairs at Zanskar. 

Over the past year of operation, Lightning Dock generated over twice the electricity it would have with the old wells. This is a relatively small power plant, with a capacity of 15 megawatts going to the local grid (about enough to power 11,000 US homes).

Oil and gas developers have chased resources deeper underground over the past few decades. Operations started relatively close to the surface, but oil and gas production can stretch down 20,000 feet or more today. “I think that arc is going to play out in geothermal,” Edwards says. While typical geothermal well fields range from 3,000 to 5,000 feet deep, it could become more common to go deeper in the future, he adds.  

The company plans to do further development at the Lightning Dock site: with a few years of development and an upgrade to the power plant, it could get even more electricity out of this area, Edwards says.

There’s been a lot of buzz and investment in enhanced geothermal systems—projects that aim to expand where geothermal resources can be used. Fervo Energy, for example, uses fracking techniques to open up rock that would otherwise be too closed off for traditional geothermal energy.

But there’s still plenty of “low-hanging fruit” in the geothermal world, Edwards says. Many of these conventional resources have plenty of potential—they just need a second look.

This article is from The Spark, MIT Technology Review’s weekly climate newsletter. To receive it in your inbox every Wednesday, sign up here. 

Correction: A previous version of this article misstated the title of Joel Edwards. He is Zanskar’s CTO, not CEO.

Received — 25 July 2026 ⏭ MIT Technology Review

The power line that could reshape New York’s grid is hitting snags

23 July 2026 at 10:00

On July 3, as a heat wave swept the region, New York State’s grid imported 52 gigawatt-hours of electricity from Canada—enough to meet about 9% of its total electricity demand that day.

Some of that power shuttled in on a 339-mile power line stretching from Quebec to Queens called the Champlain Hudson Power Express (CHPE). It opened in May and is officially the longest underground transmission line in North America.

An underground power line might not sound all that exciting, but this could be a big deal for the state’s grid planning, and for emissions. It could provide up to 20% of New York City’s electricity demand, largely with abundant hydropower from Quebec.

One wrinkle: The line has been down for most of this month, and some experts are concerned about how drought will affect the power supply feeding it. Let’s look at how the CHPE transmission line could help shape the future of our grid, and what barriers it needs to overcome to make a difference.

Planning for the CHPE (which is charmingly pronounced “chippy”) started 15 years ago, with the permitting process formally beginning in March 2010. The vision was to build infrastructure to better connect Quebec and southern New York.

Map showing the route of CHPE project over land and underwater,  south from Canada to NYC.
The Champlain Hudson Power Express stretches 339 miles from Quebec to Queens. It is officially the longest underground transmission line in North America.

Over 99% of Quebec’s electricity comes from renewable sources; most demand is met with hydropower, though the province’s wind capacity is growing quickly. New York has some hydropower of its own, as well as nuclear and wind, but the state still relies on fossil fuels for most of its energy generation.

Transmission Developers, a company owned by the alternative asset management firm Blackstone, and Hydro-Québec, the province’s manager of generation and transmission, partnered to build CHPE. Construction began in late 2022 and wrapped up earlier this year. The total cost for the privately funded project turned out to be  $6 billion.

The construction of this line was a feat. It’s made up of a bundle of two high-voltage direct-current power cables, each measuring roughly five inches across. Developers buried the bundle underground or underwater across the length of New York State. Much of the line was laid at the bottom of the Hudson River, requiring special boats that shot water jets deep into the sediment to create trenches for the cable.

Connecting grids together can help accelerate the transition away from fossil fuels. The ability to move electricity to where it’s needed could also help limit the amount of new capacity we need to build. Research has shown that interconnection can help cut emissions and lower system costs.

But CHPE is off to a slow start and has seen two outages so far. The first, on July 1, was reportedly caused by a trip at a converter on the Canadian side of the border. The second outage began on July 4, and the power line is still down as of the morning of July 22.

Some experts say this isn’t unusual for a new infrastructure project. Other power lines have seen similar startup challenges, and the equipment hasn’t really been fully tested until it’s in operation, Normand Mousseau, a physics professor at Université de Montréal, told the Gazette.

Officials traced the issue to a damaged section of cable on the US side of the border, and the company that manufactured the line sent experts to investigate the cause, according to reporting from RTO Insider, a trade publication. 

The damaged portion of the cable has been removed and replaced, says Lynn St-Laurent, a spokesperson for Hydro-Québec. “It is currently estimated that the remaining work, including necessary post-repair testing, will be completed by the weekend.”

Similar woes have afflicted the New England Clean Energy Connect line, which opened in January, stretching 145 miles from Quebec to Maine. That project has also seen outages, and very little additional energy has flowed into the Northeast.

The good news for New York is that the grid wasn’t relying on CHPE yet. “Our planning studies did not assume CHPE would be available this summer, and that was one reason the grid performed reliably during the heat wave earlier this month,” Kevin Lanahan, a spokesperson for the New York Independent System Operator, the state’s grid management company, said in a statement. “A core principle of reliability planning is not relying on any single project.” 

The idea is that eventually, states and regions will be able to rely—at least in part—on these projects, so there is pressure to get them working smoothly: Building massive transmission lines is a major long-term investment. In future years, as the equipment gets stress-tested and utilities begin to feel more confident in the projects’ reliability, they could play a bigger role on the grid.

One thing to keep an eye on moving forward is the condition of Quebec’s hydropower fleet: The region has seen intense drought for the past three years, eating into the water reserves used to generate electricity. That could mean there won’t always be abundant hydropower to ship across the border—even if the transmission lines are able to carry it. 

This article is from The Spark, MIT Technology Review’s weekly climate newsletter. To receive it in your inbox every Wednesday, sign up here. 

❌